



Chennai Metropolitan Water Supply and Sewerage Board
S No | PR No. | Title | Date | Document |
---|---|---|---|---|
1 | Press Release No.12 11.02.2025 | Due to the Chennai Metro Rail Corporation (CMRL) undertaking the connection work of the main water supply pipe on Purasaivakkam Highway, piped water supply will be suspended in some areas of Zones 5, 6, 8, 9 and 10. | 11-02-2025 |
PDF (Size : 68 KB) |
2 | Press Release No.11 10.02.2025 | Zone – 10 (Kodambakkam) – Koyambedu Kaliamman Koil Street, Sewerage pumping stations A, B, C and N.V.N. Nagar Sewerage pumping stations will not be operational from 09.00 AM to 13.02.2025 (36 hours) due to sewerage pumping works being carried out. | 10-02-2025 |
PDF (Size : 79 KB) |
3 | Press Release No.10 10.02.2025 | Special Medical Camp for the Welfare of Employees was held at the Chennai Drinking Water Board Head Office | 10-02-2025 |
PDF (Size : 59 KB) |
4 | Press Release No.09 07.02.2025 | Grievance Redressal Meeting on behalf of Chennai Drinking Water Board will be held at the Drinking Water Board's regional offices on 08.02.2025 (Saturday). | 07-02-2025 |
PDF (Size : 52 KB) |
5 | Press Release No.08 05.02.2025 | On behalf of the Chennai Drinking Water Board, under the Manali Zone, Manali Water Supply Project, the work of connecting the main water supply pipe of the Manali overhead reservoir tank to the water distribution pipe | 05-02-2025 |
PDF (Size : 63 KB) |
S No | PR No. | Title | Date | Document |
---|---|---|---|---|
1 | Press Release No.07 26.01.2025 | Zone – 4 (Thandiyarpet) Due to maintenance work to be carried out on the sewage pumping station near Prema Petrol Bunk located at MKB Nagar, West Nizhalsalai, the sewage pumping stations will not be operational in some areas under Zone – 4, 6 and Zone – 8 | 26-01-2025 |
PDF (Size : 73 KB) |
2 | Press Release No.06 26.01.2025 | On the occasion of Republic Day, today (26.01.2025), Managing Director Dr. T.G. Vinay, I.A.B., hoisted the National Flag at the Chennai Water Supply Board Head Office and paid tribute. | 26-01-2025 |
PDF (Size : 58 KB) |
3 | Press Release No.05 25.01.2025 | Due to the works to be carried out to install water measuring devices (Electro Magnetic Flow Meter) in the main pipes of the 300 million liters per day treatment plant located in Puzhal, piped drinking water supply to Zones 1, 2, 3, 4, 6, 7, 8 | 25-01-2025 |
PDF (Size : 73 KB) |
4 | Press Release No.04 24.01.2025 | Dr. T.G. Vinay, I.A.B., Managing Director, Chennai Drinking Water Board, inspected the construction work of the seawater desalination plant with a production capacity of 400 million liters per day being set up in Perur at an estimated cost of Rs. 4276.44 | 24-01-2025 |
PDF (Size : 64 KB) |
5 | Press Release No.03 22.01.2025 | (CMRL) Zone – 3 (Madhavaram) 200 feet road near Madhavaram Roundabout Bharat Petroleum Bunk and P2 - C3 Mulakade Junction due to sewage pumping station connection work, on 23.01.2025 from 09.00 am to 10.00 pm on 24.01.2025 ( 37 hours) | 22-01-2025 |
PDF (Size : 73 KB) |
6 | Press Release No.02 20.01.2025 | Corporation (CMRL) will replace the main water pipe at Paul Wells Road, Alandur Zone. Due to the works, piped water supply will be suspended in some areas under Zones 9, 10, 11, 12, 13 and in Kaul Bazaar and Pozhichalur areas under Pallavaram Municipality | 20-01-2025 |
PDF (Size : 72 KB) |
7 | Press Release No.01 10.01.2025 | Grievance Redressal Meeting on behalf of Chennai Drinking Water Board will be held at the District Offices of Drinking Water Board on 11.01.2025 (Saturday). | 10-01-2025 |
PDF (Size : 68 KB) |